You picked a new sign for your business. Now the question is: how long until it can go up? In the City of Los Angeles, most permanent signs need a permit from the Department of Building and Safety (LADBS) before we can install them. The permit is often the slowest part of the whole job, so it helps to know what to expect.
The Short Answer
A simple sign permit in Los Angeles usually takes a few weeks. Some simple signs move faster. Signs that need extra reviews, corrections or special approvals can take a month or longer. Every address is different, so the best way to get a real timeline is to let us check your property first.
What Happens During a Sign Permit
Here are the usual steps for a business sign permit in the City of Los Angeles:
- Site check. We look at your building, your zoning and any rules for your street. Zoning decides how big your sign can be and what type is allowed.
- Drawings. We prepare the sign drawings and a site plan that show the size, location and how the sign is attached.
- Application. The sign permit is filed with LADBS. If the sign lights up, a separate electrical permit is also needed.
- Plan check. The city reviews the drawings. If they ask for changes, we fix them and send them back.
- Permit issued. Once approved and paid, the permit is issued and we can schedule installation.
- Inspection. After installation, the city may inspect the sign before the permit is closed.
What Makes a Sign Permit Take Longer
- Lit signs. Channel letters and lightbox signs need an electrical permit too, which adds a step.
- Special areas. Some streets have their own sign rules, such as historic areas, coastal areas or special sign districts. These can need extra approvals.
- Large or tall signs. Pole signs, pylon signs and large monument signs often need engineering.
- Corrections. Missing details or wrong sizes mean the drawings go back and forth with the city.
- Landlord approval. Many shopping centers require the landlord to approve the design before we apply.
Do You Need a Permit for a Temporary Sign or Banner?
Often, yes. In Los Angeles, many temporary signs and banners used for business advertising need a permit, and banners over public streets go through a separate city process. A “Grand Opening” banner on your own building is usually simpler, but the rules depend on your address. If you are opening soon, ask us early and we will tell you what is allowed while your permanent sign is being permitted.
How to Get Your Sign Up Faster
- Start early. Contact us as soon as you sign your lease, not the week you open.
- Have your details ready. Your address, landlord contact and any sign rules from your lease help us move faster.
- Keep the design simple. A sign that clearly fits the size limits is approved with fewer changes.
- Use one company for everything. When the same team handles design, permits, fabrication and installation, nothing gets lost between steps.
We Handle the Permit For You
At Global Signs & Graphics, we take care of the whole process: drawings, permit filing, city corrections, fabrication and installation. Learn more on our sign permits page, read our full guide to sign permits in Los Angeles, or see our channel letter signs.
Planning a new sign? Request a free quote or call (818) 723-4047 and we will check your address and give you a real timeline.